Machine data with an explicit contract
Expose production information that operations can interpret, govern and trust.
Axiotech defines machine states, events, counts, quality context, timestamps and ownership before connecting PLCs to OPC UA, historians, MES, OEE or reporting systems.
Good fit
Use this service when
- New or existing machines with controllable PLC/data interfaces and named information consumers.
- Projects needing a bounded data contract, edge gateway, OPC UA model or staged MES integration.
Scope boundary
Not assumed or silently included
- Promising OEE improvement from connectivity alone.
- Writing directly into control behaviour from enterprise systems without command ownership, validation and fallback rules.
Why act
The operational risk behind the technical symptom
The first work package is shaped around reducing an explicit risk or enabling a named decision.
Ambiguous state models make availability and downtime reports incomparable.
Unbounded tag exposure increases load, attack surface and maintenance cost.
Timestamp, identity and buffering gaps make event sequences unreliable.
Purchasable entry points
Choose a bounded engagement before expanding scope
Final inclusions, dependencies, location, schedule and commercial terms are confirmed in a formal quotation.
Package 1
Machine-data contract workshop
Decision enabled: Approved meanings, ownership and acceptance for required information.
Package 2
OPC UA or gateway implementation
Decision enabled: A controlled interface proven against representative consumers.
Package 3
MES/OEE integration work package
Decision enabled: End-to-end production transactions with exception evidence.
Artefact manifest
What remains after the engineering work
The exact document set scales with risk and the approved work package.
- Information model and machine-state definition
- Interface, namespace and ownership specification
- Security, certificate and access configuration record
- Store/forward, timing and exception design
- End-to-end test evidence and operations runbook
Technical and responsibility boundaries
Make ownership reviewable
- The source of truth for each state, count, order and quality result is named.
- Enterprise commands do not bypass machine permissives, modes or release authority.
- Network, identity, PKI and platform-operation responsibilities are agreed with IT/OT owners.
Review and acceptance
Six gates from authority to handover
Gate depth changes with the work; named decisions and evidence remain.
- G0Scope authorityOutcome, boundaries, roles, assumptions and commercial basis agreed.
- G1Baseline acceptedKnown installed/source state, dependencies, constraints and unknowns recorded.
- G2Design approvedRequirements, interfaces, risks and acceptance evidence ready for implementation.
- G3Release candidateBuild reviewed, verified, versioned and accompanied by defect disposition.
- G4Site acceptanceCommissioning evidence, deviations and release decision recorded.
- G5Handover acceptedSource, configuration, records, recovery and residual risks transferred.
Assurance option
Compliance is a declared scope—not a badge
For regulated data, record meaning, attribution, access, timestamping, retention, audit, review and recovery requirements are captured explicitly. Suitability depends on the complete customer architecture and procedural controls, not the protocol alone.
Review validation servicesRelevant engineering evidence
TwinCAT-to-production data contract
A reference pattern connecting deterministic machine state to governed OPC UA events and downstream consumption with exception handling.
Procurement FAQ
Questions to resolve before quotation
Can you calculate OEE in the PLC?
It is possible, but the correct location depends on the required definitions, context, history, ownership and fleet consistency. The contract is defined before the calculation platform.
Do you support existing OPC UA servers?
Yes. Namespace, security, load, certificate lifecycle, semantic quality and consumer behaviour are assessed first.
Can enterprise systems send recipes or orders?
Yes when command authority, validation, acknowledgement, duplicate handling, fallback and machine permissives are designed end to end.
Next decision
Describe the outcome, installed baseline and constraints you already know.
Use “Not known” where evidence is missing. The first review will separate facts, assumptions and discovery work.